Sunny House Construction Project No.1

This project was included:

  • Remove load bearing walls
  • Installing interior doors
  • Installing 2 Patio doors
  • Installing new windows
  • New kitchen
  • Plumbing
  • Electrical: New pot lights and addition switches
  • New sub-floor
  • Hard wood flooring
  • Stairs hand rail and paint
  • Bathroom, includes: New glass standing shower, New bathtub, Tile, Vanity and toilet
  • Remove old stucco (Popcorn)
  • Plaster and Paint
  • New deck
  • Plaster and painting
Spread the love

Call now